We have a SQL 2016 AG ( consists of two SQL nodes) located in datacenter 1 which is active.
We want to add two more nodes to this SQL 2016 AG located in datacenter 2 as a DR solution.
The single SQL AG will consist of four total nodes with only one node as active n datacenter 1.
Datacenter 2 (2 nodes) need to be configured for a Manual failover. Datacenter 1 nodes need to be configured for Automatic failover ( High Availability ). Datacenter 2 nodes will also be configured for high availability. Please provide detailed steps on configuring this.
dsk