Quantcast
Channel: SQL Server Setup & Upgrade forum
Viewing all articles
Browse latest Browse all 7696

SQL 2016 AG - manual failover between Primary and DR sites.

$
0
0

We have a SQL 2016 AG ( consists of two SQL nodes) located in datacenter 1 which is active.

We want to add two more nodes to this SQL 2016 AG located in datacenter 2 as a DR solution.

The single SQL AG will consist of four total nodes with only one node as active n datacenter 1.

Datacenter 2 (2 nodes) need to be configured for a Manual failover.  Datacenter 1 nodes need to be configured for Automatic failover ( High Availability ).  Datacenter 2 nodes will also be configured for high availability. Please provide detailed steps on configuring this.  



dsk


Viewing all articles
Browse latest Browse all 7696

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>